- Completed
- 2026
- On site
- 18 months
- Location
- East Legon, Accra
Built from the East Legon Villa model on a wide plot. The arrival sequence and the rear terrace were kept as drawn. Engineering covered the double living span, and procurement locked the window package before the frame was complete. Handover was eighteen months after the plot survey.